EN

EN

EN

Photovoltaic Project

Minas Argentinas is planning the construction of a photovoltaic energy park on the land where the deposit is located. In the first stage, solar panels will be installed to produce 50 Mw. Over the next decade, construction will gradually increase to reach 800 Mw.


By upgrading the power line and the Huaco Transformer Station and, fundamentally, by building or participating in the construction of a 500 Kw link that allows us to complete the connection with the National Interconnected System, we will sell the production to anywhere in the country.

Minas Argentinas is planning the construction of a photovoltaic energy park on the land where the deposit is located. In the first stage, solar panels will be installed to produce 50 Mw. Over the next decade, construction will gradually increase to reach 800 Mw.


By upgrading the power line and the Huaco Transformer Station and, fundamentally, by building or participating in the construction of a 500 Kw link that allows us to complete the connection with the National Interconnected System, we will sell the production to anywhere in the country.